1. Something You Need To Know




Please note that SecKit tries to be helpful and provides as clear instructions as we can, but we will not be responsible for any of your loss caused during your assembly process.




Model name

SS-400, aka Tank v2


SS: Stainless Steel frame

400: build volume 400x400x400 mm³

Manual structure

Each page in this manual is written in a similar structure. Ignore the step if you already know how to do it, but you must read the “Exam” step to make sure you do it correctly.

Direction definition

Hardware types & legends

Hardwares labeled in "bold fonts" are located at this side, facing to you.

Hardwares labeled in "light fonts" are located at the other side.

Hardwares labeled in (parentheses) are optional. Usually they are M3 washers which can be ignored on hard steel surfaces.

Arrows of the same color indicate the holes using the same kinds of hardwares.

Assemble on a flat & solid surface

(O) Stiff and heavy table, large tile, granite table, etc.

(X) Carpet, thin and unstable desk, etc.

 

Tighten bolts diagonally

If there are multiple bolts, tighten them in a diagonal sequence.

Also tighten screws with proper force to prevent from damaging threads.

For the torque used on linear rails and blocks, please refer to HIWIN spec for detailed information.

HIWIN Linear Guideway Technical Information https://www.hiwin.tw/download/ tech_doc/gw/Linear_Guideway-(E).pdf

Adopted from p.84 in HIWIN spec.

Belt length

The total length of two XY belts is less than 5 meter. A 5 meter Gates belt roll is included in the Tank v2 kit. This will be plenty for 2-XY-stepper configuration.

If you're building for a 4-XY-stepper configuration, don't leave long tails while installing XY belts. Preserve a 3 cm tail at the belt clamps (extruder carriage) will be fine.

Always turn ON with steppers CONNECTED!

The stepping motor driver board needs an electronic load to function normally.

It’s highly possible to damage the drivers if steppers do not exist or are not connected well.

Don’t drink and drive

If you feel hungry, go eat.

If you feel sleepy, go sleep.

If wife is calling you, go help.


Keep a clear head you’ll get a sturdy and stable machine.

Before firing up your Tank

Check every items in this checklist to prevent something wrong.

Still have problems?

If you still have problems or find any issue, drop us a message:

FB Messenger
https://facebook.com/seckit.3dp

Email
seckit.3dp@gmail.com

Enjoy!

During the assembly you’ll feel the rigidity and be confident of this machine.