5. XY Plane

Upgrade from Go2 frame


Exam

Keep the linear block on the rail with zip ties.

Actions

Remove the two Y plates and all components above it.

Remain linear blocks on the rails with zip ties or even duck tapes.

Remove the ACM back panel for the cut in the next step. Depend on the complexity of your electronics and wiring arrangement, optionally remove or keep them on the panel.

Cut Go2 ACM back panel

Actions

Cut/drill/sand the 2 triangles off for the Go3 rear pulley housings and then assemble the panel back.

As you can see in the picture, the 27mm and 65mm are larger than the actual dimensions so there's no need to leave more margins.

Optionally remove your wirings and electronics if need.

Rear pulley housing




(Bug: these M3 hardwares will be replaced by M4's in the next revision.)

Actions

Install the rear pulley housings to the frame and assemble the idlers with F604zz/604zz bearings. The rear pulley housings also act as frame brackets.

Y rails


Exam

Don't let the linear block fall. Secure it with zip ties or even duck tapes.


Actions

Raise both Y rails each with 4 aluminum square spacers. The MGN9 rail can easily fall into the gap in an European standard 2020 extrusion.

XY Stepper mounts




Exam

Check the orientation of 20T pulleys.

Actions

Seal CF edges

Actions

To extend the component life and prevent fibers from spreading and make you itchy, it's best to seal the edges with super glue. No need to seal the bolt holes.

Be sure to work in a ventilated place.

(Tank CF parts are shown here but the same principle applies to Go CF parts.)

X rail

Exam

Don't let the linear block fall. Secure it by passing zip ties through the linear rail or use a tape.

Actions

Attache X rail to the CF back tube as shown below.

XY joiners





Exam

The upper and lower locations of the bearings are different in the left and right XY joiners.

Actions





 

X axis

Actions

The clamping force of nuts make the M3 bolts solid pillars.


Attach the XY endstop finger only on the left XY joiner.

Y endstop

Actions

Attach one endstop to the printed Y endstop mount, and attache the mount to the frame.

Extruder carriage




Exam

Note the button of the microswitch is at the upper side.

Actions

XY Belt

BMG adaptor