CC410_Major_Projects

Major Projects Page

Below are the major projects completed during the CC410 restoration:

    • 2/29/30 - New batteries (pre-purchase)

    • 3/10/20 - Boat Purchase

    • 3/15/20 - Engine carbs rebuilt

    • 4/3/20 - Haul Out. Relaunched 7/17/20

      • Zebra Muscles removed, blisters ground out.

      • Epoxy Barrier Coat applied, followed by black bottom paint

      • 4 main thru hulls removed and replaced with Marelon thru hulls.

      • 3 minor thru hulls epoxied over and sealed.

      • Swim Platform support brackets replaced with Stainless Steel brackets Butler Marine (https://butlermarine.com/platform-support-brackets/).

    • 7/20 - Replaced engine room fluorescent light with LED tube shop light.

    • 7/20 - Main engine raw water pumps rebuilt. Sherwood G45

    • Port engine internal fresh water circulation pump replaced, water pump hoses and belts replaced. (Pump from Depco)

    • 10/20 - Port engine lifters replaced - Sourced through AutoZone

    • Port engine intake manifold (to be replaced) - Sourced through AutoZone

    • 11/18/20 - Port and starboard engine starters purchased. - Port Arco 50161, Stbd Arco 50160

    • 8/20 - Replaced engine caps, rotors, plugs.

    • 8/20 - New battery charger. Removed old built in charger.

    • Port and starboard thermostats

    • All interior DC cabin lights replaced

    • Lower deck / Helm DC lights replaced

    • 9/5/20 - Main water pressure pump replaced SeaFlo series 30 water pressure pump - 45psi

    • 10/20 - Hot water heater replaced - Bosch 7gal Tronic 3000T

    • New galley sink faucet

    • New master head sink faucet

    • 10/20 - New shower heads in both forward and master showers.

    • 8/30/20 - New main salon AC system - MarinAire MSBA16K2 16,000 BTU Reverse cycle AC system

    • Carpet removed throughout boat, providing access to many hatches. Also removed previous furniture (sofa, recliner, coffee table) from main cabin. Started 8/2/20. Finished main cabin carpet removal 11/15/20.

    • 10/20 - Aft engine room bilge pumps (small and large) and float switches replaced

    • 10/20 - New curtains

    • New mattress in main cabin

    • Removed macerator

    • Removed both toilets and sewer hoses from toilets to holding tank