CC410_Major_Projects
Major Projects Page
Below are the major projects completed during the CC410 restoration:
2/29/30 - New batteries (pre-purchase)
3/10/20 - Boat Purchase
3/15/20 - Engine carbs rebuilt
4/3/20 - Haul Out. Relaunched 7/17/20
Zebra Muscles removed, blisters ground out.
Epoxy Barrier Coat applied, followed by black bottom paint
4 main thru hulls removed and replaced with Marelon thru hulls.
3 minor thru hulls epoxied over and sealed.
Swim Platform support brackets replaced with Stainless Steel brackets Butler Marine (https://butlermarine.com/platform-support-brackets/).
7/20 - Replaced engine room fluorescent light with LED tube shop light.
7/20 - Main engine raw water pumps rebuilt. Sherwood G45
Port engine internal fresh water circulation pump replaced, water pump hoses and belts replaced. (Pump from Depco)
10/20 - Port engine lifters replaced - Sourced through AutoZone
Port engine intake manifold (to be replaced) - Sourced through AutoZone
11/18/20 - Port and starboard engine starters purchased. - Port Arco 50161, Stbd Arco 50160
8/20 - Replaced engine caps, rotors, plugs.
8/20 - New battery charger. Removed old built in charger.
Port and starboard thermostats
All interior DC cabin lights replaced
Lower deck / Helm DC lights replaced
9/5/20 - Main water pressure pump replaced SeaFlo series 30 water pressure pump - 45psi
10/20 - Hot water heater replaced - Bosch 7gal Tronic 3000T
New galley sink faucet
New master head sink faucet
10/20 - New shower heads in both forward and master showers.
8/30/20 - New main salon AC system - MarinAire MSBA16K2 16,000 BTU Reverse cycle AC system
Carpet removed throughout boat, providing access to many hatches. Also removed previous furniture (sofa, recliner, coffee table) from main cabin. Started 8/2/20. Finished main cabin carpet removal 11/15/20.
10/20 - Aft engine room bilge pumps (small and large) and float switches replaced
10/20 - New curtains
New mattress in main cabin
Removed macerator
Removed both toilets and sewer hoses from toilets to holding tank