Post date: 06-May-2011 09:11:19
Reference: http://obiee101.blogspot.com/2009/02/obiee-simulating-drill-up.html
Chaeck out the basic Calendar Dimension:
On the Date level add the next higher level (month) in the Preferred Drill Path:
Do the same for Month (quarter), Quarter (year).
Check the result:
it's not perfect .....
Reference: http://obiee101.blogspot.com/2009/02/obiee-simulating-drill-up.html