Checklist for Design NIF:
NIF, DOE Form 22a (2 pages)
Form 17 / CPT Job Report
Consultant Fee Proposal
Checklist for Construction NIF at the time of RFA:
NIF, DOE Form 22a (2 pages)
Form 17 / CPT Job Report
Bid Results
Checklist for Construction NIF (typically CM prepares this):
NIF, DOE Form 22a (2 pages)
Form 17 / CPT Job Report
Consultant cost review
Change Order Proposal
Notes:
NIF Form Excel file, make sure it is current.
For CIP jobs, NIF is not needed if funds are available within the job (cannot jump between design and construction), then ask Planner to shift funds and reflect on updated Form17.
Routing for R&M Jobs,
Project Coordinator
Public Works Manager
Planning Section Public Works Manager
Auxiliary Director (Riki Fujitani)
CIP Fiscal Review (Derek Shigano)
Project Coordinator
Routing for CIP Jobs,
Project Coordinator
Public Works Manager
Planning Section Public Works Manager
CIP Fiscal Review (Derek Shigano)
Project Coordinator