PreCharge for REV3 is a simplified version of the one used for REV2. The low voltage circuitry was almost entirely removed and the board was shrunk to use as small an amount of space as possible. Other important changes included a change in the connectors (now utilizing one for HV and one for LV) and moving them to the bottom of the board. This change in location was at the request of the integration team who wanted to make it easier to remove boards from the penthouse. Following the new design constraints, via shielding was added to the edge of the board to reduce excess noise inside the penthouse.