Table of Contents
Prologue
Part I The Challenge for Industry: Regaining Lost Profits
1. Corporate Paradise Lost and Regained
The Ten Gold Nuggets for a Dramatic Profit Increase
The Alphabet Economy
Business Management - The Bete Noire, the Culprit
The Ten Gold Nuggets to Make Profits Soar
2. A Breakthrough in Reliability-The Need, Objectives, and Benefits
Objectives, and Benefits
The Compelling Need for Reliability
Causes for Poor Reliability
The Reach-Out Objectives of True Reliability
The Overwhelming, Tangible Benefits of True Reliability
The Future Direction for Reliability
An Organizational Infrastructure for World-Class Reliability
Part II What Not to do: Current but Ineffective Reliability Methodologies
3. Reliability Mathematics-Complex and Ineffective
The Bathtub Curve Does Not Hold Water
The Convoluted Logic of Military Testing
The Futility of Reliability Mathematics
The Computer Approach to Reliability
Reliability Failure Distributions
Graphical Solutions Using Weibull Plots
Main Weaknesses of Mathematics Approaches to Reliability
4. Reliability Predictors-Cooking the Books with Reliability Cookbooks
A Plethora of Reliability Cookbooks
Reasons for Inaccuracies Among the Handbooks
A Company's Own Field History - A Better Predictor
5. Reliability Estimators-A Cloudy Crystal Ball
Failure Mode and Effects Analysis (FMEA)
Fault Tree Analysis (FTA)
6. Reliability Demonstration-Throwing Money at the Problem
An Evolution in Reliability Demonstration
Thermal Cycling: The Dawn of True Reliability Progress
Single Environment Sequential Tests: Another False Start
7. Highly Accelerated Life Tests-HALT and HASS
HALT Background
HALT Methodology
Highly Accelerated Stress Screening (HASS)
Other Environmental Stress Screening (ESS)
Highly Accelerated Stress Audit (HASA)
Part III The Climb to MEOST: The Mount Everest of Reliability
8. Base Camp 1-Design Reliability Infrastructure Design: The Bete Noir of a Company's Failures
Organization of the Design Function
Management Guidelines
Techniques to Capture the Voice of the Customer
Quality, Cost, and Cycle Time in Design
Creativity Stimulation: Releasing the Engineer's Bottled-Up, Creative Genie
9. Base Camp 2-Essential Prerequisites for MEOST
Derating: Oxygen for the Climb to MEOST
Temperature: The Enemy of Reliability
Modular Designs
Design for Manufacturability (DFM)
Design for Mistake Proofing: Poka-Yoke
Design for Minimum Variability (High Cpk)
Design for Robustness: High S/N Ratio
Design for Maintainability and Availability
Design for Resale (Residual) Value
Product Liability Analysis: Preventing Ambulance Chasing
Destructive Physical Analysis (DPA)
Field Escape Control
Mini-MEOST Sampling in Production
Dealer Feedback and Zero Time Failures
Field Failure Reliability
10. The Climb to the Mount Everest of Reliability - MEOST
The Salient Principles of MEOST
MEOST History, Applications, Successes
Types of Stresses: Combined vs. Isolated Stresses
Preamble and Preparations for MEOST
The Eight Stages of MEOST
11. The Amazing Versatility of MEOST - New Applications and Challenges
Applications and Challenges
The Economic Benefits of MEOST
The Many Uses of MEOST - Its Commandeering of Many Disciplines
Appendix: Laboratory Equipment / Chambers for MEOST
References
Index