Linear scheduling methods provide an alternative way of scheduling repetitive projects, to the commonly used network methods. Critical path identification is a major attribute for both methods; therefore, it is very important for practitioners to understand the function of the two methods in this area.
Journal of Construction Engineering and Management
/ Volume 133 / Issue 7 / TECHNICAL PAPERS / Cost and Schedule
Linear versus Network Scheduling: A Critical Path Comparison
J. Constr. Eng. Manage. 133, 483 (2007); doi:10.1061/(ASCE)0733-9364(2007)133:7(483) (9 pages)