STEPPING STONES POLICY

Post date: May 2, 2015 1:05:07 AM

The following ACC recommendation has been adopted by the Kinney Village Board of Directors for implementation:

1. Stepping stone paths already in existence will be approved as long as they are safe and have been maintained by the owner. That determination will be made by the ACC. Those stepping stone paths already in existence must still be approved by the ACC through the submission of an ACC Request Form by the unit owners.

2. New paths or the replacement of existing paths must meet the following requirements:

a. All paths will consist of either pavers or flagstones.

b. Acceptable colors will be earth tones including:

i. Beige

ii. Gray

iii. Brown

iv. Other colors will not be accepted

3. For new paths or replaced paths, each owner must submit an Architectural Control Committee Submittal form requesting approval of both materials and design including a diagram of the width and length of the path. If the ACC determines that a current path is not safe or well maintained, the owner will be notified of a non-compliance and will need to submit an ACC Submittal form for the committee’s review.