Tools for Inputting the Schedule
- Run Scheduler -
- Run Scheduler -
**Enhancements In Progress** To improve the user experience and site functionality, some embedded documents are being updated to linked buttons.
The Scheduler uses the master schedule and student requests in order to schedule students with the highest percentage of filled requests. In the past, this has been called "batching" to see what the percentage student request are able to be filled. If you have taken the time to manually layout your schedule, account for the needs and requests of the students, balance planning periods, and make all of the correct selections on the individual section setup screens, you should be able to have a high "batch rate" which means students are able to take the courses they have selected. If your batch rate is low, you need to go back and look at your settings you have selected on each section as well as the design of your master schedule.
If you would like to have the Focus engine help you in "batching" to get a high batch rate, and have the time to properly use the tool, you might want to take a look at the Master Schedule builder.