Temporary stilt should be installed across dishwasher location with accessible screws or pin nails for easy removal once the countertop has been properly set
Cut the filler strip to 5/8" to ensure the kitchen cabinet drawer is not obstructed by window trim
Clean returns are expected around the lattice & base of kitchen island
Scribe molding should be installed to cover any significant gaps and create a clean transition between elements.
Kitchen cabinet installation layout is the same for all floor plans (dishwasher located directly across from range)
Install double-sink vanity cabinet in master bath, which has standing/tiled shower.
Master bath cabinets should be screwed into wall studs, properly shimmed, and have scribe molding implemented to eliminate gaps
Guest bath cabinets should be screwed into wall studs, properly shimmed, and have scribe molding implemented to eliminate gaps
Cabinet toe kick installed with glue/caulking and 23-gauge pin nails
Clean hole(s) cut in back of cabinet for plumbing
Ensure baseboards meet cabinets neatly
Center of faucet hole for bathroom vanity countertop should measure 2.5" from sink edge (and centered on the width of the sink)
Each laundry cabinet is installed to a 19" total width off of side wall
Each laundry cabinet is installed 52" from floor to bottom
Each laundry cabinet must be secured into wall studs for sufficient support
Ensure a 30" clearance width for range
Countertops must be tight to adjoining walls with clean caulking between the elements.
One hole should be cut for single-handle faucets