NOTE: Contact SI or PM at completion to confirm nothing else needs to be done prior to leaving
Image 3a
Walkable path must be provided on one side of the house
Image 4
Image 5
Prior to receiving seed & straw, all exterior landscape dirt needs to be thoroughly raked and void of any rocks, roots, or construction debris to ensure a safe and mowable product is being developed.
Image 1
Image 2
Positive drainage graded around foundation to a minimum of 6" of fall within the first 10'
Image 3
Image 6
Image 7
Pine straw must be installed underneath all porch/deck areas
Image 10
Gravel/concrete landings of external stairs must be relatively level and, at minimum, be built to meet the depth of the first stair riser
Confirm foundation drains are installed (install if missing)
Contact Superintendent or Project Manager if there are any water drainage concerns
Image 17
Gutter drains should be installed to divert water away from septic system
Image 11
Image 12
Image 13
Image 15
Image 14
Image 16