How to Load Working Line
LOADING THE WORKING LINE
Pick up female coupling
Place coupling
In either rear corner of hose bed
Continue to flat load until the last 300’
Place the last male coupling of the flat load outside of the hose bed
On diamond plate behind hose bed nearest captain side of engine
Place nozzle against hose divider on engineer side of hose bed
Flush with the end of the hose bed
Load 50’ hose on top of nozzle
Ensure first bite is loaded behind the bale
Continue to load hose
In stack load manner
Until 50’ coupling
Place 50’ coupling up on top of nozzle in front of the bale
Continue to load hose
Until 100’ female coupling
Place 100’ female coupling on top of hose
Flush with the end of the hose bed
Dutchman excess hose to the cab side of the hose bed
Place male coupling of next 100’ shoulder section flush with the edge of the hose bed
Begin to load next shoulder selection beside previous shoulder section
Place stacked folds back 6” from the edge of the flat loaded folds.
Once 50’ coupling reached, place towards tailboard side of hose bed with male coupling up
Continue to load hose with folds 6” back.
Until 100’ female coupling
Place 100’ female coupling on top of hose
Repeat steps 10-12
Until all shoulder sections complete
Connect last shoulder section female coupling
To male coupling that was removed from hose bed at the end of flat load
Place coupling on top of last shoulder section towards rear of hose bed
Connect nozzle shoulder section female coupling to male of 2nd shoulder section
Leave coupling in front of 2nd shoulder section
Connect 2nd shoulder section female coupling to male of 3rd shoulder section
Leave coupling in front of 3rd shoulder section