Module: Located on project Salesforce account under Financing
Inverter: Located on project Salesforce account under Financing
Circuit: How many modules do you have tieing into the same JBox
Location: In this drop down you will determine where the conduit run will be located
Furthest Array To Combiner Box (ft): Using our design software, measure the distance from your furthest array to the location of the combiner box. Input the distance in feet in this field
Combiner Box to POI: POI (Point Of Interconnection). Measure the distance from the combiner box to the proposed interconnection location. Input the distance in feet in this field
Electrical Service Entrance Type: Identify if the service going to the home is overhead or underground
Electrical Service Equipment Type: Identify what configuration is the project's main service panel
Electrical Equipment Condition: In this drop down you will call out any major or minor damage that is shown on the project existing electrical equipment
Electrical Working Clearance: In this drop down you will call out any major or minor violations to the projects existing electrical equipment
Existing Main Bus Rating (A): In this field you will input the projects Bus Bar rating
Existing Main Disconnect Rating (A): In this field you will input the projects Main Breaker rating
Nearest PV Disconnect Location: In this drop down, you will explain the location of the AC Disco and/or the PV breaker in relation to the existing main disconnect
Interconnection Method: Here is where you will list the interconnection method for our PV system
Panel Make and Model: Here is where you will identify the make and model of the panel we are interconnecting into
Tandem Breaker Required: In this field, if tandeming a breaker is required for our inputted interconnection method, you will list the tandems you will need
PV Breaker: Input your PV breaker
Additional Breaker (If needed): List the tandem breakers needed
Service Conductor Insulation type: Here is where you will identify if the wire insulation is fabric sheather or thermoplastic
Tap Location & Wire Length: If you interconnection is via a tap, select the appropriate drop down
Existing (or New) Subpanel Main Rating (A): In this field you will input the projects Bus Bar rating
Subpanel Bus Rating: In this field you will input the projects Bus Bar rating
New Main Disconnect: In this field you will input the projects NEW Main Breaker rating
New Electrical Panel / Box Location: In this drop down, you will explain the location of the AC Disco and/or the PV breaker in relation to the existing main disconnect