2/4/25 Please make sure if sending for electrical stamps that you are checking the stamp type. If it's digital and structural has already stamped it then electrical can't stamp it. So either design needs to separate the plan set or the unstamped plans need to be unarchived.
1/26/23 Updated process for Follow-Up Due Diligence to review all existing requirements and question whether they are actually enforced. Updates to the Compliance page to reflect monthly goals and current progress.
1/22/23 Any time a place updates to 2023 NEC or needs new labels, we need to (in addition to updating autocad and/or highline) send an email to Zachary Landers to let him know about the label change and where it applies to. For brand new labels, he'll need a good picture of it and the material, size, and other specs.
12/15/23 For revision letters for Utilities - Per Sydney "No they aren't really needed for most cases. Some utilities like us to be specific about what are correcting or it helps me know what was changed to determine if we do need to resubmit. I always submit the revision letter if is over email, but if it's a portal we can't submit them because there is no where to upload it".
They are not always required, if you have questions about whether they are please consult the salesforce utility page.
12/15/23 - When information on the plans and ENG letter do not match verify that they if the project is a ground mount. Engineering provides the ground mount ENG letter and the error would fall on them.