Below: Photos from May 2022 (scroll down further to see photos from May 2023)
Photo Below: Looking East through outdoor classroom meeting space
Photo Below: Looking East from outdoor classroom area
Photo Below: Looking down from MS entrance sign area to outdoor classroom space
Photos Below:Â Miscellaneous wildlife habitat features added near outdoor classroom area (from left to right = insect hotel, bat box, bird house).
Below: Photos from May 2023
Photo below: looking East along the "arboretum trail" from the ES entrance point
Photo below: looking West along the "arboretum trail" as you walk toward the ES entrance
Photo below: looking at playful tree decorations intended to inspire imaginative play in the forest
Photo below: looking North at MS building from the outdoor classroom space through the densely planted native shrub landscape.
Photo below: looking West from area where stream was later added.
Photo below: looking West towards the area where stream was later added.
Photo below: looking from the outdoor classroom area toward the exterior security wall at the Nature Mural Art Installation by 6th Grade Art Students in May, 2022
Photo below: looking up from the cement bridge over the stream at the upper section of the stream shortly after construction in May 2023.