With reference to the Malaysian Civil Engineering Standard Method of Measurement, the course is intended to provide a thorough understanding of the theory and practise in the measurement of construction works for demolition and site clearance, retaining walls, road works, drainage, water reticulation, and sewerage works (MyCESMM). Students will receive instruction on creating timetables and sample bills of measurements. The creation of specification clauses for the materials and craftsmanship of the measured works will also be taught to the students.
1. Measurement
1.1) Demolition & site clearance
1.2) Retaining wall
1.3) Road works
1.4) Drainage
1.5) Water reticulation
1.6) Sewerage works