The Lyme Road Multi-Use Path (sometimes called the MUP)Â The MUP was an outgrowth of the Safe Routes to School Travel plan. The construction of the Lyme Road MUP cost an extra $44,000 in conjunction with the road resurfacing, and has an expected life of 50 years! That's a cost of less than $1,000 per year. By contrast one mile of 2-lane road would cost an estimated $2,000,000 - $6,000,000 over 50 years.
With close to 1 in 3 people unable to drive themselves, this is a vital path, allowing more people to get to where they need to go without being chauffeured. The impact of this path would be magnified if it were part of a safe network of paths and street crossings. Each path and connection we make helps provide safe and sustainable mobility option that saves individuals and families money by reducing vehicle trips, and allowing for greater mobility independence.