Day 9 - Feb. 18th 2012



Getting the first wall up.


The wall is glued and secured with exterior screws to the floor's frame.



The wall from another angle. The wall is hold in place with the help of the right angle jig I previously made and one of the corners I cut off when I made the walls.


The second wall is up, glued and secured with screws to the floor's frame. Two temporary beams keep the top side of the walls.


Just another angle of the two walls.


Framing of the walls. The walls need to be framed for the hard foam insulation. The frame is hold in place by glue and screws.


The framing is slow and boring.


Framing the door.


Done for today. The edge of one wall and the door are framed.