Day 24 - Mar. 22nd 2012
Back to Day 23 - Mar. 13th 2012
The outside roof skin installed. The skin is 1/8" birch plywood.
The skin is glued to the frame. Screws keep the skin in place, but I'm going to remove them when I do the aluminum siding.
'
I have to cut the opening for the window and roof vent.
The trailer is ready for the aluminum siding, I'll have to wait for a sunny weekend for that.
Starting the hatch for the back of the trailer.
I made the sides of the hatch from 2 pieces of 1/2" plywood glued together.
Waiting for the glue to dry.