Day 23 - Mar. 13th 2012

I used this stain for the floor and it took about 3 days to dry (oil based) first coat. Yesterday I did the second (and last) coat... I'll have to wait another 3 days to continue.

I installed the frame for the vent. This was necessary because the vent is ticker than the roof.

I also installed the frame for the window. The frame is cut from 5mm plywood.

You can see the floor color is darker than the walls, I used a different stain.

The frame glued and clamped in place.