Day 16 - Feb. 28th 2012



The interior skin installed on the second side wall too. This is also 5mm plywood. The "nice" side faces the interior.

I replaced all the drywall screws I used so far with exterior screws. 


Exterior screws.

Done with the side walls so far. Both porch light switches are installed. The reading lights and switches installed also.