Final materials list (same as in project plans because I didn't need anything else):
First half progress and pictures:
These are the prototypes for the escapement assembly, frame assembly, ratchet tooth assembly and the drum assembly. The long rod is the 1/16 inch diameter stainless steel rod needed for each of these assemblies. I will use a hacksaw to do cut the right length pieces.
Above is the spinner assembly with brass tube and stainless steel tub pieces.
The bags contain the subassemblies and the tubes/rods corresponding to each one.
These little plastic bags contain the other hardware needed. On the right, there is a color-coded list for the size tubes/rods required for each subassembly.