Above is a portion of AT's latest schematic for the VR Blvd / Stoney Trail interchange design for the WCRR DB1 or "North Project", dating from January 2020. It shows the number of lanes and travel direction and also highlights the location of new storm management ponds in blue. We have added the location of a number of development proposal in heavy red outline surrounding Valley Ridge.
The schematic below shows more detail for the Valley Ridge Blvd interchange. This design schematic was first made public by AT at a community meeting for Valley Ridge residents held on September 7, 2019 at the Four Points Sheraton Hotel and is available for download from AT's project website.
This schematic provides details as to the location where trees were removed along the south perimeter of Valley Ridge, and the locations for a proposed noise barrier, a stormwater feedermain to be installed and the City of Calgary's water feedermain re-alignment. In addition it shows the location of two of AT's updated, north to south profiles profiles, "A" and "B", east and west of Valley Ridge Boulevard.