Below is AT's project plan for the WCRR North Project and the expected ultimate design for the full VR Blvd and Stoney Trail interchanges. The schematic conceptually shows what the completed Valley Ridge Boulevard & Stoney Trail interchanges will look like when complete in approximately 2024.
The Transportation Utility Corridor (TUC) boundary, shown as a heavy orange line, has been enlarged in certain areas via expropriations by AT to accommodate a larger interchange design at VR Blvd and additional basket-weave lanes acting as on- and off-ramps. As a result, West Valley Road south of the highway between Valley Ridge Boulevard and Stoney Trail is to be permanently closed. It will be replaced with a new east-west connector road on the south side of Victory Village and the Climbing Center.
The dark blue polygons are the locations of various, new storm management ponds.
Crestmont Boulevard is to be re-aligned and replaced with a new road shown in red wrapping around the southern boundary of what will be Shape Development's future development footprint. This new access road will function as a two lane, interim solution until such time as Shape's development commences at which point Crestmont Boulevard will be upgraded to four lanes including two additional roundabouts designed to provide access into Shape's site from the south side. We understand these later upgrades are to be funded by the City of Calgary and Shape Developments.