IDG Servicing (Neo)
IDG Servicing (Neo)
AMM Ref:
Consumables: As per AMM
1) LST, CFC & Rag pieces
2) Developer
3) Locking wire (thick & thin both)
4) Filter-kits
Tools:
1) Taskcard
2) Torque wrench # 200 in-lbs
3) Expander # 1/4 to 3/8
4) Twister, C-duct pump
5) IDG Charging & drain tool
6) Tray , Bucket , Funnel , Jerrycan
7) Spanners # 3/4 , 1"
8) Ratchet # Extension # 6" (3/8 drive)
9) Sockets # 3/4 , 1"
10) Common tools
Support Equipments:
1) Three step trestle
2) Generator
Precautions/Tricks: As per AMM
1) Before draining oil of IDG , properly connect IDG drain tool to de-pressurized IDG.
2) Before installing filter, check presence of internal seal & lubricate it properly.
3) Do not over fill IDG.
Warning: Always use updated AMM / IPC,Task card, etc for performing any work on aircraft.