Monday, Jan 26th - Worked on circuit schematics with Mr. Rojas, finalized bill of materials, worked on Fusion model, this is part of the technological process and the mathematical process to calculate voltage. This is also the ideate step of the design process as we are generating a solution to our problem with connection regarding power and voltage and AC/DC power.
Tuesday, Jan 27th - Worked on circuits schematics and continued to create a rough draft of ventilation holes and circuit schematics. This is the ideate step of the design process. We are generating a wider range of solutions due to running into issues with connection and voltage.
Wednesday, Jan 28th - Isometric view of updated fusion model. Added ventilation on the top of the frame so that when components get warm, the heat can travel upwards and out of the design. This is the prototype/implement step of the design process. We are updating the model with the changes we discussed.
Thursday, Jan 29th - Internal view of model with speaker placed on the bottom of frame. Speaker holes will now be underneath the frame to enhance sound quality once assembled. This is part of the prototype/implement step of the design process as it includes us making a general prototype of what the final product will look like including the circuits and ventilation
Friday, Jan 30th -External power supply now placed to ensure proper voltage distribution. We also added a centralized hole on the top of the frame for a microphone. This is the Prototype/implement step of the Design Process. We are adding parts by prototyping and implementing them.