MARPOLE
Annex I of MARPOL 73/78: Regulations for the Prevention of
Pollution by Oil
Chapter I – General
Regulation1 Definitions . . . . . . . . . . . . . . . . . . .
Regulation2 Application . . . . . . . . . . . . . . . . . . . ..
Regulation3 Equivalents . . . . . . . . . . . . . . . . . . . ..
Regulation4 Surveys . . . . . . . . . . . . . . . . . . . . . ..
Regulation5 Issue or endorsement of Certificate . . ..
Regulation6 Issue or endorsement of a Certificate
by another Government . . . . . . . . .
Regulation7 Form of Certificate . . . . . . . . . . .
Regulation8 Duration and validity of Certificate .
Regulation 8A Port State control on operational
requirements . . . . . . . . . . . . . . . .
Chapter II – Requirements for control of operational pollution
Regulation9 Control of discharge of oil . . . . . . . .
Regulation 10 Methods for the prevention of oil
pollution from ships while operating
in special areas . . . . . . . . . . . . . . . . .
Regulation 11 Exceptions . . . . . . . . . . . . . .
Regulation 12 Reception facilities. . . . . . . . . . . . . . ..
Regulation 13 Segregated ballast tanks, dedicated clean
ballast tanks and crude oil washing . . .
Regulation 13A Requirements for oil tankers with
dedicated clean ballast tanks. . . . . . . . .
Regulation 13B Requirements for crude oil washing . . ..
Regulation 13C Existing tankers engaged in
specific trades . . . . . . . . . . . . . . . . . . .
Regulation 13D Existing oil tankers having special ballast
arrangements . . . . . . . . . . . . . . . . . . . .
Regulation 13E Protective location of segregated ballast
spaces . . . . . . . . . . . . . . . . . . . . . . . . .
Regulation 13F Prevention of oil pollution in the event
of collision or stranding . . . . . . . . . . . .
Regulation 13G Prevention of oil pollution in the event
of collision or stranding – Measures for
existing tankers . . . . . . . . . . . . . . . . . .
Regulation 14 Segregation of oil and water ballast and
carriage of oil in forepeak tanks . . . . . . .
Regulation 15 Retention of oil on board . . . . . . . . . ..
Regulation 16 Oil discharge monitoring and control
system and oil filtering equipment . . . . .
Regulation 17 Tanks for oil residues (sludge) . . . . . . ..
Regulation 18 Pumping, piping and discharge
arrangements of oil tankers . . . . . . . . . .
Regulation 19 Standard discharge connection. . . . . . ..
Regulation 20 Oil Record Book . . . . . . . . . . . . . . ..
Regulation 21 Special requirements for drilling rigs
and other platforms . . . . . . . . . . . . . . .
Chapter III – Requirements for minimizing oil pollution
from oil tankers due to side and bottom damages
Regulation 22 Damage assumptions . . . . . . . . . . . . ..
Regulation 23 Hypothetical outflow of oil . . . . . . . . ..
Regulation 24 Limitation of size and arrangement of
cargo tanks . . . . . . . . . . . . . . . . . . . . .
Regulation 25 Subdivision and stability . . . . . . . . . . ..
Regulation 25A Intact stability . . . . . . . . . . . . . . . . . ..
Chapter IV – Prevention of pollution arising from an oil pollution
incident
Regulation 26 Shipboard oil pollution emergency plan ..
Appendices to Annex I
AppendixI List of oils. . . . . . . . . . . . . . . . . . . . ..
Appendix II Form of IOPP Certificate and
Supplements . . . . . . . . . . . . . . . . . . . .
Appendix III Form of Oil Record Book . . . . . . . . ..
Unified Interpretations of Annex I . . . . . . . . . . . . . . .
Appendices to Unified Interpretations of Annex I
Appendix1 Guidance to Administrations concerning
draughts recommended for segregated
ballast tankers below 150 m in length . . .
Appendix2 Interim recommendation for a unified
interpretation of regulation 13E . . . . . . .
Appendix3 Equivalent provisions for the carriage
of oil by a chemical tanker . . . . . . . .
Appendix4 Connection of small diameter line to the
manifold valve . . . . . . . . . . . . . . . . . .
Appendix5 Specifications for the design, installation
and operation of a part flow system for
control of overboard discharges . . . . . . .
Appendix6 Offshore platform discharges . . . . . . .
Appendix7 Interim guidelines for the approval
of alternative methods of design
and construction of oil tankers
under regulation 13F(5) of Annex I
of MARPOL 73/78 . . . . . . . . . . . . . . .
Appendix8 Guidelines for approval of alternative
structural or operational arrangements
as called for in MARPOL 73/78,
Annex I, regulation 13G(7) . . . . . . . . .
Appendix9 Interpretation of requirements for
application of hydrostatic balance
loading in cargo tanks
(resolution MEPC.64(36)) . . . . . . . . .
Annex II of MARPOL 73/78: Regulations for the Control of
Pollution by Noxious Liquid Substances in Bulk
Regulation1 Definitions . . . . . . . . . . . . . . . . . . . ..
Regulation2 Application . . . . . . . . . . . . . . . . . . . ..
Regulation3 Categorization and listing of noxious
liquid substances . . . . . . . . . . . . . . . . .
Regulation4 Other liquid substances. . . . . . . . . . . ..
Regulation5 Discharge of noxious liquid substances ..
Regulation 5A Pumping, piping and unloading
arrangements . . . . . . . . . . . . . . . . . . . .
Regulation6 Exceptions . . . . . . . . . . . . . . . . . . . ..
Regulation7 Reception facilities and cargo unloading
terminal arrangements. . . . . . . . . . . . . .
Regulation8 Measures of control . . . . . . . . . . . . . ..
Regulation9 Cargo Record Book. . . . . . . . . . . . . ..