FOURTH ENGG DUTY AND RESPONSIBLITY PLEASE NOTE
SAFETY + FAM
EMCY ESCAPE
EXTINGUISHERS
LIFEBOAT(MUSTER STATION+ENGINE STARTING)
EMCY GENY
EMCY AIR COMP
LIFE JACKET N IMMERSION SUIT DONNING
ENGINE ROOM LAYOUT N DIFF MACHINERIES
OPERATIONS
BUNKERING(LINES, IMP VALVES, INTERCONNECTIONS)
SOUNDING PIPES LOCATION, TOTAL ULLAGE
REMEMEMBER DENSITY CORR FORMULA
TRASNFER PUMP VALVES AND OPERATIONS
IF AUTO THEN FIND OUT THE LEVEL OF CUT IN/OUT
LEARN THE LINES
BILGE+SLUDGE LINES+INCINERATOR OPERATION+OWS OPERATION
STARTING STOPPING OF PURIFIERS
LEARN THE MANUAL STARTING AND DESLUDGING PROCEDURE
TRACE PURIFIER LINES
COMPRESSOR LINES+COOLING ARRANGEMENT+OIL TOPPING UP
LEARN TO USE PMS
MAINTAINANCE
LOCATE ALL MANUALS
LOCATE PURIFIER+COMP SPECIAL TOOLS
LOCATE PURIFIER+COMP SPARES
GO THROUGH HISTORY BOOKS
START READING MANUALS
FOR SEWAGE TREATMENT PLANT, FIND OUT THE DOSAGE, BACK FLUSHING ARRANGEMENT
(THE ABOVE CHECKLISTS IS WITH THE ASSUMTION THAT THE 4/E IS RESPONSIBLE FOR BUNKERING, PURIFIERS, COMPRESSORS N PUMPS. IF ANY OTHER MACHINERY, THEN THE SAME THINGS APPLY)
THESE ARE THE THINGS YOU SHOULD KNOW SOON AFTER YOU JOIN. HOPE THIS WILL BE HELPFUL. FEEL FREE TO CONTACT ME IN CASE OF ANY DOUBTS.