1. Mount the NOVAQ and Power Supply Unit (PSU) onto the DIN rail. Use the provided DIN rail end stop to secure the NOVAQ in place and maintain airflow between devices.
2. Insert the stripped PE wire (without ferrule) directly into the device ground terminal (green) and tighten the terminal screw securely.