Test Description: Test the function of the GNSS through CDH, and the interface with CDH and payload for LISSA.
*NOTE* The FM GNSS receiver & LISSA payload are considered Controlled Goods and can only be handled by those with clearance under CGP. If you lack security clearance, the EM GNSS (UMS-0631) receiver is CoCom enabled and available to use (without the payload).
Completed:
Documented by: Riley Sweeney
Resources Required:
Tools: Required tools such as cleaning equipment, chemicals, jigs, hand tools, etc.
Hardware and Equipment: UMS-0632 FM GNSS receiver, UMS-0651 FM GNSS antenna, FM FlatSat, LISSA Payload
PPE: FM testing will likely occur in the clean room. Please follow all clean room safety guidelines. Please wear an ESD bracelet and use ESD mat when working with electronics.
Verification Activities: R-LIB-ADC-006-6968. R-LIB-ADC-100-6980, 6982. R-LIB-ADC-101-6984, 6981. R-LIB-ADC-110-6986, 6985. R-LIB-ADC-120-6987, 6989. R-LIB-ADC-130-6990, 6991. R-LIB-ADC-140-6992, 6993. R-LIB-ADC-141-6994, 6995. R-LIB-ADC-142-6996, 6997.
Pass Criteria:
The GNSS shall limit its current draw (R-LIB-ADC-006-6968).
The GNSS shall interface with the LISSA payload (R-LIB-ADC-100-6980, 6982).
The GNSS shall output PVT data at a minimum rate of 1 Hz (R-LIB-ADC-101-6984, 6981. R-LIB-ADC-110-6986, 6985. R-LIB-ADC-120-6987. R-LIB-ADC-142-6996, 6997).
The GNSS shall determine position within 25 meters (R-LIB-ADC-130-6990, 6991).
The GNSS shall provide position data in Earth-fixed coordinates (R-LIB-ADC-140-6992, 6993).
The GNSS shall provide a PPS signal to the payload (R-LIB-ADC-141-6994, 6995).
GNSS Receiver - Bottom View
GNSS Receiver - Top View
GNSS Antenna - Bottom View
GNSS Antenna - Top View
Provide a description of the test apparatus that will be used, and the process to install the test article. This is particularly important for Vibration and TVAC activities.
Provide step-by-step instructions for additional activities needed before beginning the test. This could include preparing software, data storage folders, or installing sensors.
Provide an step-by-step instructions for completing the test, including data logging, inspection activities, etc.
Include information about apparatus tear down, clean up, consumables storage, and how to store test data.
Provide step-by-step instructions for data analysis, including location of data storage.