Our bathroom facilities have been established for the past 19 years. As such they are now in urgent need of repair and upgrading. Presently, in the upper division bathrooms we are experiencing leakage of water daily and the source of the leak we cannot trace since all plumbing is under concrete. Therefore, we have an urgent need to re-do the entire plumbing for the bathrooms. Below is the estimate amount of materials needed to help us address the situation.
Materials Type Quantity Cost
PVC Pipes ¾ inch 15 lengths $251.25
Elbows ¾ inch 40pcs $40.00
Control valves ¾ inch 10 $55.00
Ts ¾ inch 18 pcs $18.00
Sleeves ¾ inch 40pcs $40.00
Cilps 6 dz $54.00
Screws and plugs 1pk $61.00
PVC Pipes ½ inch 3 lengths $41.25
Male adapter 20 pcs $15.00
45 degree elbows ¾ inch 6 pcs $6.00
Valves ½ inch 10 pcs $45.00
Elbows ½ inch 10 pcs $3.50
Shower head 6 $129.00
Faucets 2 $13.00
Reducer ¾ in to ½ inch 20 pcs $25.00
Glue 4 tins (medium) $23.00
Complete sewage set 1 $300
Water base paint 3 tins $180
TOTAL: $1,300.00