The following are several photos of the Chapel Garden construction.
Construction of new Sardis Connnector at the junction of Mt. Vernon Rd and Thompson Bridge Rd (Hwy 60).
Photo of the site of the Medical complex being built between Sothers Rd. and Price Rd. located across Hwy 60 from the Kroger parking lot and LVE.
The first of five buildings to be built in the medical complex shown on the left has been completed and is currently occupied.
The second building to be built is a Hospice Center. The site of that building is shown above on the right with access shown from Sothers Rd.
The hospice site is shown above on the left with access from Price Rd.
The beginning of the hospice building construction.
Access entrance to the hospice building across the Price Rd. from CVS.
Site of the Fifth Third Bank construction in front of the storage building adjacent to LVE and directly across Hwy 60 from the hospice building.
Closer view of the Fifth Third Bank construction.
No new condominiums are currently under construction. However, it appears that a swimming pool and pool house are being constructed just across the road, as shown in the photo below.
No new information about the buildings projected to be built on the three graded areas in the above photo.