Panorama showing Sardis Connector constructon on the far left, the completed medical building by Southers Rd. in the middle and the Hospice House being constructed on the right.
Sardis Connector construction at the junction of Thompson Bridge Rd. (Hwy SR60) and Mt. Vernon Rd.
Closer view.
C
Different view.
A glimpse of the Sardis Connector construction near where it joins Ledan Rd.
Hospice House construction across the Hwy from the new Fifth Thirds bank shown nearing completion in front of the storage bldg.
Hospice House under Construction
Closer view.
Different view.
Fifth Third Bank nearing completion.
Hospice House entrance across Price Rd. from CVS.
Construction area near Publix.
The condominium complex is more than half completed but construction seems to be slowing down. Still no information on when restaurants will be built on the graded areas behind CVS.
This picture shows Hwy SR60 between the Mt. Vernon Rd traffic light and the front entrance to LVE. Cars can accelerate considerably by the time the Mt. Vernon traffic light turns green and the car reaches the LVE entrance. Occationally a car will run through the junction on a red light at the LVE entrance, so it is a good idea to look both ways after the light turns green before entering Hwy SR60.
Mt. Vernon Rd. and Wauka Mountain