The picture shows the project schedule for our technical paper. We used the AON method to show which is the critical path that we may use to allow us to be on track for our report. As a procrastinator and a visual learner, I must say that project scheduling helped me maintain doing my work in a pace I am comfortable with.
As someone who is better at absorbing concepts than calculations, I must say that I have contributed a great deal to properly formulating and ensuring that the methodology and concepts in our thesis are correct to ensure a smooth sailing interpretation of results and being on track especially financial-wise.Â
As the designated timekeeper for the event, I was able to adjust the time for each section to ensure we would meet our target time especially because our webinar was delayed due to unforeseen problems on the end of our speaker.