1. Bidding & Reserve Move-Up Lines:
Set Days Off
One block of at least four (4) days off on a Reserve Line will be designated as “Set”. If the line does not have a block of four (4) or more days off, then the largest block of days off will be designated as Set. The only exception to the largest block of days off being designated as Set is a line with a block of 7 or more days off, in which case that block would not be considered the Set block and the next largest block would be designated as Set. For example, in a line built with a block of 8 days off and a block of 4 days off, the 4-day block designated as Set.
Under no circumstances may a Reserve be assigned into a Set block of days off. A Reserve may, however volunteer to work into Set days off.
Set day off dates will be shaded in each Reserve Line in the bid packet. Once loaded in the Master Schedule in CCS, they are indicated as IOFF.
Release to Set Days Off
Reserves will automatically be released from duty at 1600 Home Domicile Time (HDT) on the day prior to a block of Set days off unless a prior assignment has been made.