Divisions
The following are the sixteen divisions listed in the Master Format 1995 Edition.[3]
· Division 01 — General Requirement
· Division 02 — Site Works
· Division 03 — Concrete
· Division 04 — Masonry
· Division 05 — Metals
· Division 06 — Wood and Plastics
· Division 07 — Thermal and Moisture Protection
· Division 08 — Doors and Windows
· Division 09 — Finishes
· Division 10 — Specialties
· Division 11 — Equipment
· Division 12 — Furnishings
· Division 13 — Special Construction
· Division 14 — Conveying Systems
· Division 15 — Mechanical/Plumbing
· Division 16 — Electrical
[click] ARCHITECTURE COVER PAGE
[click] CONST ASSEMBLIES & SPECS A-901 Division 1 & 2 General Requirement / Site Works
[click] CONST ASSEMBLIES & SPECS A-902 Division 3 & 4 Concrete and Masonry
[click] CONST ASSEMBLIES & SPECS A-903 Division 5 Metals
[click] CONST ASSEMBLIES & SPECS A-904 Division 6 & 7 Wood and Plastics and Thermal and Moisture Protection
[click] CONST ASSEMBLIES & SPECS A-905 Division 8 Doors and Windows
[click] CONST ASSEMBLIES & SPECS A-906 Division 9 Finishes
[click] CONST ASSEMBLIES & SPECS A-907 Division 10 (Specialties) 11 (Equipment) 12 (Furnishings) 14 (Conveying Systems)
[click] DETAILS A-501
[click] DETAILS A-502
[click] DETAILS A-503
[click] DETAILS A-504
[click] ELEVATIONS A-201 South & North coloured
[click] ELEVATIONS A-201 South & North
[click] ELEVATIONS A-202 East & West coloured
[click] ELEVATIONS A-202 East & West
[click] FLOOR PLANS A-101 Site Plan Color
[click] FLOOR PLANS A-101 Site Plan
[click] FLOOR PLANS A-102 Basement Floor Plan
[click] FLOOR PLANS A-102a Basement Level 2 Floor Plan
[click] FLOOR PLANS A-103 Ground Floor Plan
[click] FLOOR PLANS A-103a Ground Floor Slab Edge Plan
[click] FLOOR PLANS A-103b Ground Floor Plan
[click] FLOOR PLANS A-104 Typical Floor Plan
[click] FLOOR PLANS A-104a Second Floor Slab Edge Plan
[click] FLOOR PLANS A-104b Third Floor Slab Edge Plan
[click] FLOOR PLANS A-105 Fourth Floor Plan
[click] FLOOR PLANS A-105a Fourth Floor Slab Edge Plan
[click] FLOOR PLANS A-106 Roof Plan
[click] FLOOR PLANS A-106a Roof Plan Slab Edge
[click] FLOOR PLANS A-106b Mechanical Room Roof Plan
[click] FLOOR PLANS A-107 Units 102 106 112
[click] FLOOR PLANS A-108 Units 101 115 128 Lobby Garbage Party
[click] FLOOR PLANS A-109 Units 109 124
[click] FLOOR PLANS A-110 Units 104 105 107 204-207 304-307 404-407
[click] FLOOR PLANS A-111 Units 103 108-110 202 203 208-210 302 303 308-310 402 403 408-410
[click] FLOOR PLANS A-112 Units 111 201 211-214 301 311-314 401 412-414
[click] FLOOR PLANS A-113 Units 215 216 232 315 316 332 415 416 431
[click] FLOOR PLANS A-114 Units 116-118 128 217-220 231 317-320 331 417-420 430
[click] FLOOR PLANS A-115 Units 119-121 127 221-223 229 230 321 323 329 330 421 422 428 429
[click] FLOOR PLANS A-116 Units 122 123 125 126 224-228 324328 425-427
[click] FLOOR PLANS A-117a Units 423 424
[click] FLOOR PLANS A-117b Units 411
[click] SCHEDULES A-601 Door Schedule
[click] SCHEDULES A-602 Window Schedule
[click] SCHEDULES A-603 Finish Schedule
[click] SECTIONS A-301 Building Section A-A
[click] SECTIONS A-302 Building Section B-B & C-C
[click] SECTIONS A-303 Sections
[click] SECTIONS A-304 Sections
[click] STAIRS A-401