Below is the proposal presented to the Board. These are conceptual designs, to be refined during the development of construction documents. Cost figures are projections to be adjusted after the bidding process.
Slide show of proposal presented to the Board (January 2021)
How they look now (June 2020)
Slide show of proposal to the Board (April 2020)
Description of plans (June 2019)