Night 5 (2/9/16) page 96

Post date: Feb 11, 2016 3:58:29 AM

Tonight was spent adjusting the wire lengths so that the correct amount was hanging down from the top of the printer and locking them in place with zip ties. Then the towers were straightened, then belts and carrages were installed on each leg.

Another 10 pages down, so hopefully done by early next week!