Night 1 (2/4/16)

Post date: Feb 10, 2016 4:02:50 AM

Hot end RTV and installation of resistors and thermistor

Power supply connectors made and installed on power supply (power supply prep done)

Heated bed preparation done (thermistor, resistor, indicator LED, signal wires, power wires)