Post date: 03-May-2009 03:16:34
Please note the electrical main supply will be shut off as follows:
Date: Wednesday May 6, 2009
Time: 10am to 1pm
This will only affect the Tower Block, including all emergency lights and signs, and the lifts in the tower block.
The shut down is due to recalibration of Main Switch Board in the Gen-set room, ie to recalibrate the earth fault and over current relay and service of Air Circuit Breaker, by contractor Soon Heng Electrical Co.
Any inconvenience caused is much regretted.
Thank You.