Post date: 25-Mar-2009 03:49:00
The swimming pool will be closed for repairs from April 6 to April 24, 2009.
The contractor, Jupiter Pool (M) S/B, will be repairing leaks in the swimming pool, which is the source of water that leaks into the drainage near blocks 33/35 and 37/39.
We apologise for any inconvenience.