Project
Overhead Bridge Crane System Modifications
Location
Everett, Washington
Owner
The Boeing Company
Employer
The Boeing Company
Title
Project Manager
Description
Modifications to overhead bridge cranes, which operate from the 120’ factory truss level to transport aircraft components and materials across most of the main manufacturing building in Everett. The work included removal of the bridges, replacement of structural rails and mechanical end truck components, and reinstallation of the modified bridge. All removals and reinstallations were to be completed without impacting normal production operations.
Schedule
Approximate four month removal, rework, and reinstallation period per bridge
Budget
$2 Million (approximately $300,000 per bridge)
Statistics
Total of 28 individual bridges in overhead factory bridge crane system
Selected Achievements