Fifth Class visited the Lisglennon Water Treatment plant on the 8th May 2025. Sincere thanks to Pamela Bergin for all her assistance.
The Ballina Lisglennon water treatment plant serves a population of 15,500 people at a volume of 8,000m3/day and operates for 23 hours/day. A portion of the Ballina area is served by the Ballina Wherrew water treatment plant. The Lisglennon plant was constructed in mid-1980’s and includes the following treatment; coagulation with aluminium sulphate, clarification in 3 clarifiers, rapid gravity filtration in 3 filters, disinfection with chlorine gas and fluoridation.