Upgrade - 22/06/2023

Fixes

Fixed: When an Invoice item was added to a Supplier Debit Note, the total was not automatically updated.

Fixed: You were not able to delete a linked Material from the Finishing edit form in standard estimating.

Fixed: When copying SO to DN, the Out Qty calculation was including cancelled DNs.

When an SM is copied to a Quotation, the Reference field on the SM is now copied to the Reference field on the Quotation - previously the SM Category was copied to the Quotation Reference field.

WO Material - The In Stock quantity is now displayed for all materials - previously it was displayed only for materials linked to a Stock Location.

The Pre-press item in the Product Estimating description is now displayed at the top, after the Size. Previously it was the last item in the description.

The Online Documentation menu item once again opens the BOS Pro Learning Centre.