After configuring all devices, the QA process commences. During this phase, we meticulously verify that each device has been configured correctly and that no steps have been overlooked. Within the Zuper ticket, we indicate the completion of each device, and a Google Sheet is utilized to document the QA process. This step extends to Site Enablement, as certain steps may correlate beyond QA.
There's a few things we check for during QA
1. All Equipment Counted/Verified
2. Unbox all equipment and visually check for any damages
3. Cameras/Speakers Configuration Complete.
-IP Assigned
-Equipment Configured
-Hardware placed back in box
-Equipment/Box Labled Accordingly
4. Switch Configuration Complete.
-Password setup
-IP Assigned
-Timezone Assigned
-Switch Named According to SOP
-POE Configured
-MSTP Turned off
5.Strobe Configuration Complete.
-Strobe Assembled according to SOP
-Strobe Profile Uploaded
-IP/Password Accessible
-Flash Tested
6. Point to Point AP/CB Configuration Complete
-Profiles Uploaded
-Device accessible according to uploaded profile
-Matching MAC assigned.
-Device/Box labeled according to site design and uploaded profile.
-All hardware checked/returned and placed in box
7. NAS Configuration Complete
-SSD image copied
-DSM merged and Updated
-DSM configured according to SOP
-VM configured according to SOP
-VPN uploaded and configured according to SOP
-IP Assigned
-Device labeled
-All necessary hardware returned to box
8. EZOutlet Configuration
-Password Updated/Tested
-IP Assigned/Tested
-Device Labled
-All necessary hardware returned to package
9. Any Updates or Changes to Site
10. All devices and necessary items have been correctly placed and boxed according to SOP standards