A rare example of a Henry Rice industrial building. Rice (1808-76) was Borough surveyor and ran a hugely busy practice from his office in Liskeard. Over 100 of his buildings remain in-and-about the town centre. This warehouse is an excellent example of how Rice could adopt Classical styling on his buildings. It is situated on Well Lane, in the heart of the town.
September 2020: The building has now been sensitively-converted into two flats.