All development shall comply with the provisions of this Sec. 7-50 regarding the design and installation and/or extension of public services and utilities. Extensions of public utilities shall take place within a defined Activity Envelope which may include separate designated areas for such extension different from those portions of the Activity Envelope designated for primary structures, accessory structures, or driveways. Disturbed areas shall be required to be revegetated pursuant to Sec. 7-20-10(d) to the maximum extent permitted by Colorado law.
(a) Applicability
(b) Consistency with Land Use Polices, County Master Plans and Utility Service Plans
(c) No Adopted Master Plan or Utility Service Plan
(d) Sizing of Utility Lines
(e) One-Time Installation
(f) Coordinate Utility Line Extensions
(g) Avoid System Overloads
(h) State and County Standards
(i) Utility Company Service Commitments
(j) Colorado Public Utility Commission Approval
(k) Location of Service Lines
Where a new service line is being installed to replace an existing line, the Community Development Director may authorize the use of the same routing as the existing line if such routing does not create significant additional impacts on surrounding properties.
(a) Applicability
(b) New Water Rights
(c) Adequate Water Provision
(d) Water Distribution Systems
(e) Adequate Water Quality
(a) Applicability
(b) Connection to Public Systems Required, Where Available
(c) Design Standards