Activity #1 Planning Principles

Activity #2 Brainstorm Masterplan Scenarios

Participants were for their ideas regarding scenarios to study over the summer and into next fall. They were asked to feel free to think out of the box options that might be considered — changing grade configurations — fixing up the buildings we have — building all new K-12 buildings, etc.  

A wide range of options were suggested. Presented below are the more common themes (new buildings identified in bold). The full array of responses can be found in the verbatim document.

 

6 Tables — a new Junior High with renovations to the High School and/or Lincoln Trail 

4 Tables — a new High School with the Junior High moving to a renovated High School building. 

4 Tables — some kind of grade configuration change with a building for (Pre-K-1, 2-6, 7-8 and 9-12). or  (Pre-K-2, 3-4 (at Lincoln Trail), 5-6 (new), 7-8 (new) and a renovated/upgraded High School. 

2 Tables — suggested a two campus configuration — a Pre-K 5 campus east and a 6-12 campus west.  

2 Tables — suggested expanding Middletown Prairie to be a K-5 building. 

 

There were a wide variety of additional ideas This included things like other configurations using new and existing buildings, high school/junior high sports facilities, renovating all existing buildings, various ideas for the bus barn, use of portables, ideas about sport facilities and joint spaces and programs with the village, and ideas for private fundraising efforts to support the program.