Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Accomplishments from Previous Week
● Delivering/shipping of materials to begin prototyping (Garrett)
● Combination materials testing (Garrett and Miles)
● 3D printed linked hexagonal plates (Garrett)
● Shaped moldable plastic into a plastic outer shell (Jordan)
● Drew out design concepts (Jordan)
● Apply rubber sheet to the prototype along with continued sewing practice (Ho)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
● Have at least one prototype made, with zipper and/or velcro strap attached(Ho and Jordan)
● Field test at beach with prototype (entire team)
● Continue combination material testing and waterlogged samples (Miles and Garrett)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
● Laces could work if they are paracord or nylon
● Try calling JHRG, LLC (the UHMW-PE fabric supplier)
● Continue testing ideas in parallel, many of them will not work (sponge)
● Start testing materials on feet ASAP
● Could try linking 3D printed hexagons to a fabric rather than each other
● Flexibility is more of a concern than thickness
● Try Flex Seal on various materials/fabrics
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
● Recommended http://www.hsarmor.com/htm/Fabric.htm and Protomold (https://www.protolabs.com/services/injection-molding/plastic-injection-molding/)
● 3D printing an insole mold
● Contact Chris Cassidy for flexible 3D printing
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
● Making sure an air/water pocket doesn’t form in the sock, creating drag when trying to swim
● Professionalism of the design itself
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
● Have at least one prototype testing next week
Budget (list amount spent and amount remaining)
amount spent $283.41
amount remaining $716.59
Progress on Report and Webpage